Shop Floor Control - Bottleneck Analysis ReportFunctionUse this report to determine where scheduled production will cause a bottleneck . Base the report on whatever utilization is necessary and run it for only certain operations and through a set range of dates. A resource that has demand that exceeds capacity is considered to be a bottleneck. The estimated starting date, actual start, and estimated completion dates are shown, along with the date required.
=>To access this menu... Select the Bottleneck Analysis Report from the Reports menu. Bottleneck Analysis Report
About the Fields
In the Beginning/Ending Operation Code field...
In the Beginning/Ending From Date field...
In the Percentage field... Enter the minimum percent of utilization to report. Any operation that is scheduled beyond this utilization will be considered a bottleneck.
Open? checkbox...
Planned? checkbox...
When finished making entries to the fields…
Sample Bottleneck Analysis Report See Output Options.