Purchase Order Processing - Appendix B - Landed Cost
Landed Cost is calculated by the Purchase Order Invoice Entry task (see Invoice Line Item Detail in Purchase Order Invoice Entry). The system automatically allocates any additional charges entered during invoice entry back to each of the line items which were originally received.
The
Purchase Order Line
Code record contains a "Landed
Cost (Y/N)?"
flag
which controls how any additional amount is allocated back to the original
line items.
For “O” (Other) type charges added during invoice entry, the line amount is added to the total allocation if this flag is marked.
For “S” (Standard), “N” (Non-Stock) and “O” (Other) type lines from the original receipt, setting the flag indicates to the system that these items should be included as part of the invoice total for determining the allocation percentage, and that they should be allocated a portion of the additional charges based on quantity or total cost (based on the current parameter setting).
Consider this sample receipt:
Seq | Item | Quanity | Cost | Extension |
---|---|---|---|---|
010 | B100 | 1 | 85.00 | 85.00 |
020 | Non-Stock Item | 5 | 1.00 | 5.00 |
030 | Other PO Receipt | 4 | 2.50 | 10.00 |
040 | Invoice Charge A | 10.00 | ||
050 | Invoice Charge B | 10.00 |
If all of the landed cost flags are set, then the system will allocate $20.00 back to the first three line items. Using the extended amount as the basis for the allocation:
Seq | Item | Invoice Extension | Percent of Total | Allocated Amount | Landed Cost |
---|---|---|---|---|---|
010 | B100 | 85.00 | 85% | 17.00 | 102.00 |
020 | Non-Stock Item | 5.00 | 5% | 1.00 | 1.20 |
030 | Other PO Receipt | 10.00 | 10% | 2.00 | 3.00 |
If the line code used for Invoice Charge B was set to “N”, then only Invoice Charge A ($10.00) would be allocated.
This second example assumes that the line code for the Other PO Receipt has been set to “N” (exclude from landed cost process):
Seq | Item | Invoice Extension | Percent of Total | Allocated Amount | Landed Cost |
---|---|---|---|---|---|
010 | B100 | 85.00 | 94% | 18.80 | 103.80 |
020 | Non-Stock Item | 5.00 | 6% | 1.20 | 1.24 |
030 | Other PO Receipt | n/a | n/a | none | 2.50 |
Computing Landing Cost - Applying a Third Party Freight Bill to a Purchase Order
Purchase Order line codes may be set up to optionally apply the cost of the line item to Landed Cost. Set up a line code with Landed Cost = Y (for example, F for Freight) and another with Landed Cost = N (e.g. O for Other Charges).
During PO Invoice Entry, in the PO detail section, add a Freight (F) line with the freight amount, so it will distribute to the landed cost of the inventory purchased. Add a second, Other (O) line (that won’t affect landed cost) with a negative of the freight amount. This will cause the $ total to the vendor to be correct, yet still distribute the freight to the inventory.
Example: PO Invoice Entry—Purchase Order Line Items
Seq | Cd | Item | Quanity | Cost | Extension |
---|---|---|---|---|---|
010 | S | Bicycle Part | 100 | 6.00 | 600.00 |
020 | F | Freight to Inventory | 1 | 50.00 | 50.00 |
030 | O | Freight Paid to Shipper | 50.00- | 50.00- | |
Invoice Total | |||||
600.00 |
Of course, for expense recording and payment, the invoice for freight must also be entered separately to the shipper.